
ABSTRACT
The construction of Suramadu Bridge give an impact on land values in foot bridge
areas. This study aims to analyze the impact of the bridge on land values, before
and after presence of the bridge. The results of this research shows land values
at Labang is more than before. While, land values at Arosbaya, as control areas,
has not changed significantly before and after the construction. The comparison
between subject areas and control areas before the construction, were not
significantly different. While, after the construction, there are significant differences
between two samples tested, indicating that the existing Suramadu bridge has
impact to the land value at Labang compared to land values at Arosbaya, as
control areas.

Tidak ada komentar:
Posting Komentar